Monday, May 24, 2010

Eighth Week, ( Monday, 24/5/2010 )

Assembled the sensors at the swapper modules for second machine 'ASDS 22".

Then, My supervisor ask me to check the connection of wiring for shuttle 'ASDS 22' because he want to run the shuttle today. Using multimeter, i checked the wiring for the shuttle.

Add the plastic tubing and fitting for the shuttle



check the wiring for the shuttle

No comments:

Post a Comment