Monday, June 28, 2010

Twelve Week, ( Thursday, 25/6/2010 )

Today is the last day of Industrial Training.

In the morning, Assembled conveyor for LEAK machine


Then, Fill up Tools Requisition and Return Form because to return the tool box back to company.

Trainees have a short briefing by the Human Resource Department, Puan Asnida. She thank you to all the trainees because we improved the production of the company of the past 3 month.

Return the tool box.

Sunday, June 27, 2010

Twelve Week, ( Thursday, 24/6/2010 )

Tidy up the tubing for the LEAK machine and put the Label inside the tubing

Solder the Wiring for the blower of the WAP machine

Twelve Week, ( Wednesday, 23/6/2010 )

Put the conveyor on the WAP machine and alignment it properly.

Assembled the cover for the conveyor

Twelve Week, ( Tuesday, 22/6/2010 )

Tidy up wiring for the LEAK machine

Assembled component for SEAL machine

Run the movement of hard disk for the SEAL machine

Twelve Week, ( Monday, 21/6/2010 )

Most of the Machine for the LINE 1 done already and ready to send to customer.

Assembled the part lift inside the conveyor for the LEAK machine and alignment it so that it can extend and retreat the nest precisely.
Try test the part lift using software and adjust the air pressure so that it can extend an retreat the carrier of hard disk correctly

Eleventh Week, ( Friday, 18/6/2010 )

Tidy up wiring for the WAP machine

clean the floor from waste wire and all the rubbish

Eleventh Week, ( Thursday, 17/6/2010 )

Alignment conveyor of the SEAL machine so that the hard disk can trough it smoothly.

Try run the movement of hard disk inside the conveyor using software.

Assembled the scanner for LEAK, make sure the scanner in the correct position. This is because to make sure that, the scanner can detect the bar code.