Then, we were put under the same engineer with one of the unitens student also,Yusuf.
From the start of the industrial training Yusuf already in assembly 2.
Then, the engineer, Mr. John asked me to put the fitting tubing and label it for the one of LN2 machine, its name is WHACK AND PURGE machine (WAP).

Then, connect the Whack 48 VDC power supply wiring. First, i look the drawing for the wiring life, ground and neutral and where the wire had to be connect.

Drawing for wiring

Whack Power Supply
No comments:
Post a Comment